THE PROJECT
The Wellington Hospital expansion was a large project that we were thankful to be part of. We worked on this new build for 2.5 years. The extension to Wellington Hospital offers a fit-for-purpose space for paediatrics, with a design centred on children’s needs.



Location
Sector
Division
Wellington
Healthcare
Passive Fire
Nimbl Insulation were on site completing mechanical and hydraulic insulation work when we had the opportunity to expand our passive fire team into Wellington. This was a great opportunity and challenge. As the passive fire design had not been completed, we were finding solutions as we went. Nimbl worked very closely with fire engineers to develop solutions as the build progressed.
This meant no two weeks were the same. We operated as a coordinated unit and needed to adapt quickly. We installed fire doors and fire boxes despite restricted access and limited space.
Passive fire protection is a safety system, so getting it right is always our top priority. On a project like this, where we were constantly adapting to different penetrations and developing solutions, our focus was on delivering safe, compliant passive fire work.
We worked with PFITS Consultancy to ensure that this goal was met. Every two weeks, site visits were carried out to review our work. This was a huge help, giving the team confidence in their work and adding an extra layer of assurance that the solutions were appropriate. Throughout our collaboration with PFITS, we had a defect rate of less than 1%.
PRODUCTS USED
THE OUTCOME
This experience taught us a lot and marked the beginning of our passive fire work in Wellington. It gave us confidence in our ability to deliver without compromising compliance or the quality of our work. We are proud to have worked alongside McKee Fehl Construction. Te Wao Nui began accepting patients in October 2022, bringing child health services in Wellington together under one roof for the first time.